Galway City Council plans to proceed with planning permission under a Part 8 application for a proposed Active Travel Scheme approximately 1.7km long on the R339 Monivea Road from the Old Ballybrit Road junction (East) to the R865 Ballybane Road junction. This will provide a safe and attractive active travel route, catering for all walkers, wheelers and cyclists, including vulnerable road users.
We intend to lodge a planning application for this project in the coming months. When this application is made, Galway City Council will invite submissions and observations from members of the public as part of a statutory period of public consultation. Further updates on this will be available on this webpage, and in local press.
The main aims of this project are:
- Route Development: To provide high-quality cycling facilities along the route identified that will make a significant contribution to meeting Galway City Council and the National Transport Authority’s objectives to encourage the continued modal shift from car use to active travel modes.
- Public Transport: To provide for improvements to bus stop infrastructure for the existing bus services on all routes.
- Interconnectivity with other schemes: To allow for future tie-ins with other existing and proposed active travel schemes in the area, including Ballybane Road, Castlepark Road and onwards to the future BusConnects: Dublin Road scheme.
The works will include:
- A new 3m wide two-way cycle track along the northern side of the road, reducing in places where constraints exist.
- New and upgraded 2m footpaths on both sides of the road.
- The provision of a typically 6.4m road carriageway for general vehicular traffic. with generally 3m two-way cycle track, along with 2m footpaths on both sides of the R339 Monivea Road, reducing in places where constraints exist.
- Reduction in road carriageway widths for general vehicluar traffic to 6.4m.
- Junction tightening and the introduction of raised pedestrian crossings with continued footway surface on all side roads to prioritise the movements of walkers and wheelers.
- Continuous cycle track crossings on all side road junctions to prioritise cyclists' movements.
- The provision of pedestrian and cyclist crossings at signalised junctions.
- The provision of pedestrian crossings throughout the scheme.
- Upgrading of the R339 Monivea Road / L5029 Castlepark Road junction.
- The provision of landscaping along the route.
Drop-In Public Information Event
Members of the public who have questions on this project, or who wish to give feedback, are invited to meet the design team at an upcoming Public Information Event:
Where: Clayton Hotel Galway, Ballybrit, Galway, H91 D526
When: Thursday March 19, 3pm - 7pm
Alternatively, if you have any queries, please contact us at ActiveTravel@GalwayCity.ie.